Lennox striker sws160 사용자 설명서

다운로드
페이지 32
14
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
1.  Check that all chimney pipe joints are securely fastened.
2.  Check that the heater is securely fastened to the floor (if ap-
plicable).
3.  Make sure the intake vent has clear access to outside air (if ap-
plicable).
4.  Make sure the outside air vent has been sealed properly to keep 
rodents out (if applicable).
5.  Be sure all roof flashings are watertight.
6.  Be sure the stove is properly grounded (if applicable).
FOR YOUR OWN PROTECTION AND INSURANCE PURPOSES, 
HAVE YOUR CHIMNEY AND CONNECTOR PIPE INSTALLATION 
INSPECTED BY YOUR LOCAL BUILDING CODE AUTHORITY OR 
FIRE MARSHAL BEFORE STARTING A FIRE IN YOUR STOVE. 
NOTIFY YOUR INSURANCE COMPANY.
CAUTION:  Wear gloves during brick installation in case of 
sharp edges inside the stove.
Note: Installation of the baffle boards and baffle blanket is easier when 
you can still access the flue outlet, (before connecting the flue vent). Be
sure the baffle blanket is placed flat on the baffle boards so as not
to block exhaust flow to the flue. Use a ruler or a piece of kindling to 
reach over the baffle blanket to be sure it is completely flat on top of the 
baffle boards.
 
Measure bricks before installing, as per list of dimensions on next page, 
to be sure the correct bricks are installed in the correct location.
 
1.  Install bricks #1-18 in the numbered sequence shown in Figure 14 
on Page 15.
            
2.  Next, you will install the rear baffle boards which are the smaller two 
of the four baffle boards.  The boards will be installed with the 3-9/16” 
dimension from the front to the rear of the firebox.  These boards 
will be placed on the top side of the rear baffle just to the rear of the 
middle secondary tube, you will push the baffle boards towards the 
rear of the firebox until they fall in place at the rear side of the middle 
secondary tube.  You will place one board to the far left side of the 
firebox and one board to far right side of the firebox.  Confirm that 
both boards are laying flat on the rear baffle and that they are not 
overlapping each other.
POST INSTALLATION CHECKS
BRICK INSTALLATION