Operations and Maintenance
A report of the RFS iDEN/802.11 site should be maintained and left on site. The
report should include iDEN Interface, Power Plant, and RFS. This report will
provide metrics for possible concerns with individual components and /or the
entire system.
report should include iDEN Interface, Power Plant, and RFS. This report will
provide metrics for possible concerns with individual components and /or the
entire system.
It is important that the technician performing the checks understand the
equipment theory and operation. Review the documentation (references) prior to
verification and performing service.
equipment theory and operation. Review the documentation (references) prior to
verification and performing service.
This chapter contains procedures for the following:
•
Upgrading System Software
•
Preventive maintenance
•
Corrective maintenance
•
Field replaceable units (FRUs)
•
Alarm resolution procedures,
•
Repair and technical support
7.1 Upgrading System Software
The RadioFrame System is shipped with the latest software and hardware
installed. With each new software release, RFN provides its customers with the
new software (this software can also be downloaded from the RFN FTP site) and
upgrade instructions for that release in the Customer Release Notes RFN_X.X
(P/N 991-xxxx-00). The instructions describe how to upgrade to the latest
software from any prior version.
installed. With each new software release, RFN provides its customers with the
new software (this software can also be downloaded from the RFN FTP site) and
upgrade instructions for that release in the Customer Release Notes RFN_X.X
(P/N 991-xxxx-00). The instructions describe how to upgrade to the latest
software from any prior version.
To upgrade hardware, refer to section 7.4 Field Replaceable Units—RadioFrame
System.
System.
7.2 Preventive
Maintenance
7.2.1 iSC-3
Refer to the Gen 3 Site Controller System Manual, Motorola, 68P80801E30-O for
preventive maintenance information.
preventive maintenance information.
7.2.2 Power
Plant
A report of the Total Plant Condition should be maintained and left on site. The
report should include rectifier, controller operation and condition of batteries. This
report should include rectifier, controller operation and condition of batteries. This