Comba Telecom Ltd. RX-7W22 사용자 설명서

다운로드
페이지 40
INSTALLATION GUIDE FOR RX7W22 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 14 
 
 
 
 
3.2.2  INSTALLATION CHECKLIST 
 
Working space available for installation and maintenance for each mounting arrangement. Ensure 
unrestricted airflow. 
 
 
Ensure earthing point is within reach of the ground wire. 
 
 
Ensure a power source is within reach of the power cord and the power source has sufficient capacity.  
 
 
Where appropriate, ensure unused RF connectors are terminated. 
 
 
Do not locate the equipment near large transformers or motors that may cause electromagnetic 
interference. 
 
 
Reduce signal loss in feeder cable by minimizing the length and number of RF connections. 
 
 
Ensure VSWR of antennas system < 1.5:1. 
 
 
Ensure equipment will be operated within the stated environment (see datasheet) 
 
 
Observe handling of all cables to prevent damage. 
 
 
Donor antenna should have a narrow beamwidth and positioned in line-of-sight (LOS) to donor BTS 
site so that the donor signal level is maximized. This allows the use of minimum gain to achieve the 
maximum DL output power. The UL gain is typically set lower than or equal to the DL gain to minimize 
noise interference to the donor BTS 
 
 
Service antenna should be selected based on the type of service area, e.g., indoor antenna for indoor 
application, and panel antenna for outdoor application.