Comba Telecom Ltd. RX-7W22 사용자 설명서

다운로드
페이지 40
INSTALLATION GUIDE FOR RX7W22 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 20 
 
 
 
 
4.2 
COMMISSIONING PROCEDURE 
Perform the following procedures for system commissioning. 
 
Connect and inquiry status
Set channel No.
Input power detection and adjust the direction of 
Donor Antenna
Output power confirmation
Drive test and adjust the direction of Service 
Antenna
Adjust UL ATT and confirm the call quality 
Double check the status of BTS Uplink and the isolation 
between Donor Antenna and Service Antenna 
End
Set monitor parameters
Isolation detection