ADC Telecommunications Inc. F0684-112 사용자 설명서

다운로드
페이지 236
Help Hot Line (U.S. only): 1-800-530-9960
7-11
D-620616-0-20 Rev F
CONFIDENTIAL
Fusion Wideband Installation Procedures
The following procedures assume that the system is installed and programmed.
7.4.1
Installing a Fusion Wideband Main Hub
CAUTION: Install Fusion Wideband Main Hubs in indoor loca-
tions only.
Installing a Fusion Wideband Main Hub in a Rack
The Fusion Wideband Main Hub (2U high) mounts in a standard 19 in. (483 mm) 
equipment rack. Allow clearance of 76 mm (3 in.) front and rear, and 51 mm (2 in.) 
on both sides for air circulation. No top or bottom clearance is required.