Elster Solutions LLC VRT02 사용자 설명서

다운로드
페이지 47
VRT
 
D
IRECT 
G
AS
-M
ETER 
T
RANSPONDER 
O
VERVIEW
  
CHAPTER
 
3
 
Page 10 
VRT Gas Transponder ― User Guide  
 
AMCO Automated Systems • P/N 52870T010 Rev 1 May 2003 
 
 
1.  At the factory during the manufacturing process 
2.  At the time of installation once the transponder has been 
attached to the meter 
3.  In the field as required by the utility 
4.  During the course of normal transponder operation 
 
Columns showing a check mark ( 
9
 
) indicate the data must be 
programmed at the given stage. The “+”  indicates an optional 
reprogramming stage for this item. An X in the column indicates the 
data is not programmed during this stage. 
 
When Programmed/Recorded 
Function/ Data 
Factry 
Install 
Field 
Ops 
Comment 
1a. Initial electronic index reading 
9
 
+
 
User manually sets electronic index to current 
mechanical index. 
1b. Record cumulative electronic 
index reading 
x x x 
9
 
Transponder automatically reads counts and logs 
electronic index reading. 
2.  Current date 
9
 
+
 
+
 
Programmed at factory. 
3.  Current time 
9
 
+
 
+
 
x
 
Time of day for the time zone specified by the utility. 
Can be manually set/ reset or synchronized to the 
interrogator’s real-time clock upon each reading. 
4.  Daily read capture time (History 
start time) 
9
 
+
 
+
 
Time of day at which the transponder will capture the 
daily read value.  
5.  Record Daily read history 
9
 
Read history accumulates daily, transponder stores up 
to 35 days of readings. 
6. Time-of-use (TOU) start and 
end times (optional) 
9
 
+
 
+
 
Indicates the TOU time slots selected by the utility. 
Readings are accumulated between the specified start 
and stop times. (See TOU time slots table in 
Appendix) 
7.  Record Time-of-use (TOU) 
readings (optional) 
x x x 
9
 
Accumulates counts in the TOU time slots.  
8.  Pre-divider 
9
 
+
 
+
 
Specifies the rollover of subcounts into counts. 
9.  Pressure- compensation factor 
9
 
+
 
User sets the proper pressure-compensation factor 
after transponder is installed. Transponder calculates 
adjustments to readings accordingly. 
10.  Next Daylight Savings Time 
Start Date 
9
 
+ +
 
This is the date Daylight Savings Time starts. If 
daylight savings time is observed, the initial settings 
are programmed at the time of manufacture. Updates 
to daylight savings time are communicated through the 
VRT Route Manager and interrogators. 
11.  Next Daylight Savings Time 
End Date 
9
 
+
 
+
 
This is the date Daylight Savings Time ends. If 
daylight savings time is observed, the initial settings 
are programmed at the time of manufacture. Updates 
to daylight savings time are communicated through the 
VRT Route Manager and interrogators.