Elster Solutions LLC VRT02 사용자 설명서
VRT
D
IRECT
G
AS
-M
ETER
T
RANSPONDER
I
NSTALLATION
CHAPTER
4
Page 12
VRT Gas Transponder ― User Guide
AMCO Automated Systems • P/N 52870T010 Rev 1 May 2003
Chapter Four
Chapter Four
Chapter Four
Chapter Four
VRT Direct Gas-meter Transponder
Installation
Installation
Installing the VRT DGT on any of the three types of meters (A, R
and S) is quick and easy.
We estimate the complete process (including initial baseline
programming) will take an experienced installer about five minutes
to complete, assuming all tools, equipment and materials are on
hand.
and S) is quick and easy.
We estimate the complete process (including initial baseline
programming) will take an experienced installer about five minutes
to complete, assuming all tools, equipment and materials are on
hand.
Tools, Equipment and Materials
All or some of the following items may be needed in order to install
the transponder, depending upon the type of meter/index and the
condition of the old index cover and gaskets:
• VRT Direct Gas-meter Transponder
• TRACE SRP, PI or other suitable interrogator/programmer
• Index screws (2 each) *
• Meter mounting bolts (3 or 4 each, depending upon the meter
type) *
• Index cover (if old one is not reusable)
• Index cover gasket *
• Putty knife or scraper (to remove old gaskets)
• #2 Phillips screwdriver
• Awl (to remove existing vandal plugs)
• Vandal plugs (2 each) *
• Pressure-compensation factor value, if needed (obtain from
• Index cover gasket *
• Putty knife or scraper (to remove old gaskets)
• #2 Phillips screwdriver
• Awl (to remove existing vandal plugs)
• Vandal plugs (2 each) *
• Pressure-compensation factor value, if needed (obtain from
AMCO Automated Systems)
* Supplied with the transponder