Checkpoint Systems Inc. OSTT 사용자 설명서
2-6
S o u r c e T a g g i n g T e s t e r U s e r G u i d e
Tag Testing Line Preparation
This procedure assumes that all the initial configuration of the software has been
completed. If not, see
completed. If not, see
for details.
Before configuring the software, the tags must be ready to be run on the production line.
Follow your company’s procedures for the correct installation method.
Follow your company’s procedures for the correct installation method.
Fixed Tag Testing Amount
This procedure explains how to configure the STT program for a finite amount of tags.
Choose this option when testing a set number of tags for a particular product code, for
example 1,000 tags for a line of shirts. If you are testing an unlimited amount of tags, see
Choose this option when testing a set number of tags for a particular product code, for
example 1,000 tags for a line of shirts. If you are testing an unlimited amount of tags, see
1
Launch the Source Tagging Tester by double-clicking the Tag Tester icon on the
desktop.
desktop.
2
If you need to customize the Yield, see
for details on how to adjust the
settings.
3
Click Shift. The Shift window displays.
Figure 2.4
Shift Window
The Shift window allows you to customize each production line to match the name of
the operator and the Product Code of the labels. The Shift # is automatically
determined based on the User Preference and the computer’s clock.
the operator and the Product Code of the labels. The Shift # is automatically
determined based on the User Preference and the computer’s clock.
4
Type the Production Date to be run.
5
For each Unit you are testing, type the name of the operator of the line and the
applicable Product Code.
applicable Product Code.