Checkpoint Systems Inc. OSTT 사용자 설명서

다운로드
페이지 18
2-6
S o u r c e   T a g g i n g   T e s t e r   U s e r   G u i d e
Tag Testing Line Preparation
This procedure assumes that all the initial configuration of the software has been 
completed. If not, see 
 for details.
Before configuring the software, the tags must be ready to be run on the production line. 
Follow your company’s procedures for the correct installation method.
Fixed Tag Testing Amount
This procedure explains how to configure the STT program for a finite amount of tags. 
Choose this option when testing a set number of tags for a particular product code, for 
example 1,000 tags for a line of shirts. If you are testing an unlimited amount of tags, see 
1
Launch the Source Tagging Tester by double-clicking the Tag Tester icon on the 
desktop.
2
If you need to customize the Yield, se
 for details on how to adjust the 
settings.
3
Click Shift. The Shift window displays.
Figure 2.4 
Shift Window
The Shift window allows you to customize each production line to match the name of 
the operator and the Product Code of the labels. The Shift # is automatically 
determined based on the User Preference and the computer’s clock.
4
Type the Production Date to be run.
5
For each Unit you are testing, type the name of the operator of the line and the 
applicable Product Code.