Checkpoint Systems Inc. OSTT 사용자 설명서

다운로드
페이지 18
U s i n g   S o u r c e   T a g g i n g   T e s t e r :   T a g   T e s t i n g   L i n e   P r e p a r a t i o n  
2-7
6
If necessary, type the name of the Shift Manager for the Overall Shift.
7
Click Prod. The Production window displays.
Figure 2.5 
Production Window
The Production window allows you to enter a preset amount of labels to test. The 
numbers that appear here can appear in the Final Report.
8
Type the Start and Finish dates.
9
Type the total amount of labels for all units to be tested in the Target No. of Labels 
field.
10
For each line to be tested, type the Product Code for each Unit.
11
Click Start to begin testing.
12
Start the tag testing line. The STT program counts the tags for each Unit selected.
13
When the counting is complete, click Stop. See 
 for 
details on how to save the information.
Unlimited Tag Testing Amount
This procedure explains how to configure the STT program for an unlimited amount of 
tags. Choose this option testing many rolls of tags. If you are testing a limited amount of 
tags, see 
1
Launch the Source Tagging Tester by double-clicking the Tag Tester icon on the 
desktop. 
2
If you need to customize the Yield, se
 for details on how to adjust the 
settings.