1.  Introduction
This Quick Start Guide describes the installation procedure for the PTS series 
hardware.  The PTS is essentially a power fallback switch, that automatically 
switches power from a primary input to a secondary input when power to the 
primary input is lost or interrupted.
2.  Hardware Installation
Apply Power to the MPC
Refer to the warnings and cautions at the beginning of this guide and the 
power rating nameplate on the PTS back panel, and then connect the unit to 
two appropriate power sources.  For units with detachable power input cables, 
connect the power input cables to the power inlets, install the cable keepers, and 
then connect the primary power input cable to your primary power supply and 
the secondary power input cable to your secondary power supply.  Refer to the 
table below for information concerning power requirements and maximum loads.
 
Model No.
Input 
Feeds (x2)
Input 
Voltage
Max. Load 
per Outlet
 
Outlets
Max. Load 
per Unit
PTS-8NE15-1
15 Amps
100 to 120 VAC
12 Amps
8 ea. NEMA 5-15R
12 Amps*
PTS-9CM20-2
20 Amps
200 to 240 VAC
10/16 Amps
8 ea. IEC-60320-C13 
1 ea. IEC-60320-C19
16 Amps*
*  In accordance with UL requirements, this value has been de-rated to 80%.
Power Input Feeds:
•  PTS-8NE15-1:  Two (2) IEC-60320-C14 Inlets.
•  PTS-9CM20-2:  Two (2) IEC-60320-C20 Inlets.
Notes:
•  After connecting your power cables to the PTS unit, make certain to 
secure the cables in order to prevent accidental disconnection.
•  PTS-1 series units are designed for switching power input lines that 
are typically 120 VAC.  If a power input lower than 120 VAC is 
connected to a PTS-1 unit, then power switching features will not 
function correctly.
•  PTS-2 series units are designed for switching power input lines that 
are typically 240 VAC.  If a power input lower than 240 VAC is 
connected to a PTS-2 unit, then power switching features will not 
function correctly.