Installation 18 
Component Quantity 
Part 
number 
Side panel 50U kit 
AN991A 
50U rack bracket kit 
21 
AP014A 
Either of the following busway dropbox and PDU kits: 
 
Single phase HP POD busway dropbox kit 
 
Single phase <sci)short_name> PDU bracket kit 
-or- 
 
Three phase HP POD busway dropbox kit 
 
Three phase HP POD PDU bracket kit 
 
30 
88 
 
30 
88 
 
AP912A 
AQ684A 
 
AS613A 
AQ683A 
Rack interface seal kit 
21 
AP013A 
 
The HP POD is delivered with heavy duty filler panels installed in every empty U space of the racks. 
However, HP recommends purchasing additional heavy duty filler panels (AF073A) to prevent 
compromising the integrity of the cold aisle set point temperature when IT equipment is removed for 
upgrades or maintenance. 
The quantity and model of PDUs included with your HP POD are dependent on the IT equipment load they 
are supporting. 
 
Preinstallation checklist 
  
 
CAUTION: 
 Tighten the electrical busway connections after the HP POD is in its final location 
and before you begin the installation process. 
  
Before you begin the installation of your HP POD, verify the following action items have been completed: 
 
All components are delivered to your facility. 
 
The HP POD, transformer, switchboard, and water distribution kit are in their final locations. 
 
You must have facility power at your final location. You can provide the connection cables from the 
facility to the transformer and switchboard or purchase connection cables from HP at additional 
costs. 
 
You must have facility water at your final location. You can provide the connection hoses from the 
facility to the water distribution kit or purchase connection hoses from HP at additional costs. 
 
The HP POD has been properly grounded. 
 
Required tools 
 
10-ft ladder (2) 
 
6-ft ladder (2) 
 
Tongue-and-groove pliers with 4.25-in capacity jaws 
 
Screwdriver set 
 
Ratchet set 
 
Diagonal cutters 
 
Heavy-duty tie wraps