HP Performance Optimized Data Center (POD) 40cp 사용자 설명서

다운로드
페이지 63
 
Installation 19 
 
Pipe wrench 
 
Installing the HP POD using the optional components 
The following steps are an overview of the installation procedure for installing a HP POD, using the 
transformer, switchboard, and the water distribution kit. 
You must obtain service professionals to connect your power and water. 
  
 
IMPORTANT:
  All wiring in and around the HP POD must be completed by a licensed 
electrician. 
  
  
 
IMPORTANT:
  All plumbing to and from the HP POD must be completed by a licensed plumber.
  
 
Connecting the water 
  
 
CAUTION: 
 All customer supplied water fittings must be composed of carbon steel, stainless 
steel, or copper. Do not use cast iron, aluminum, or PVC fittings.  
  
1. 
Before you connect your facility water to the water distribution kit, flush the cooling water pipes. 
a. 
Connect water directly to the HP POD. 
b. 
Allow the water to run until it is clean, flushing any contaminates that might have entered the 
cooling pipes during shipping or delivery. 
  
 
  NOTE:
  For quick reference, the water hoses are labeled with green tape and white arrows 
pointing in the direction of the water flow. 
  
2. 
Connect the 4-in return and supply lines from the water distribution kit to the HP POD.