HP Performance Optimized Data Center (POD) 40cp 사용자 설명서
Site requirements 7
•
Cooling water
•
Power
•
Drain (optional)
Available to connect to central facility infrastructure
•
BMS via BacNet protocol
•
Security system
•
Convenience outlet power
•
Site networking connection
•
Domestic water for humidifier (optional)
Transformer, switchboard, and water distribution kit locations
If you choose to purchase the kits, consider:
•
Distance from the facility utilities
•
Distance from the HP POD
The transformer and switchboard can be installed within 3 m (10 ft) of the HP POD during normal
installation. The transformer and switchboard can be installed over 3 m (10 ft) from the HP POD, but this
requires additional planning and costs. HP recommends installing the transformer and switchboard no
more than 30 m (98 ft) from the HP POD.
The water distribution kit can be installed within 3 m (10 ft) of the HP POD during normal installation. The
The water distribution kit can be installed within 3 m (10 ft) of the HP POD during normal installation. The
water distribution kit can be installed over 3 m (10 ft) from the HP POD, but this requires additional
planning and costs. HP recommends installing the water distribution kit no more than 30 m (98 ft) from
the HP POD.
HP POD connection locations
HP POD connection locations
Callout Connection
1
Main input power junction box