Siemens ASC77.2U 사용자 설명서

다운로드
페이지 5
Document No. 129-420 
Installation Instructions  
December 13, 2004 
Short shaft applications 
NOTE:  The short shaft adapter is included in 
the packing box with the shaft adapter.  
With the short shaft adapter in place, align the 
notch of the EAS over the protruding tab on the 
position adapter ring and secure in place.  
(See Figure 7)
 
Short Shaft
Adapter
EA1
178R1
 
Figure 7.  Attaching EAS to GCA/GIB/GBB Shaft Adapter. 
Preparing the EAS for Mounting 
2.  On the back of the EAS, push the plastic inserts into 
the mounting holes. (See Figure 8 and Figure 9)
3.  Mount the position indicator on the face of the EAS 
 
EA1
182R1
b
f
 
Figure 8.  For GMA/GEB Actuators, Use Top Screw Holes. 
 
f
EA1
181R1
b
 
2
Figure 9.  For GCA, GBB, GIB Actuators, Use the Bottom 
Screw Holes. 
 
Mounting External Auxiliary Switch to 
Actuator 
1.  Nest the alignment peg of the EAS position adapter 
ring into the notch (See Figure 10).  
 
The EAS lies flush against the face of the actuator.  
EA1
183R1
9.5 ± 1.5 lb-in (1.1 Nm ± 0.2)
 
Note:  GMA/GEB 
actuators use top 
screw holes, GCA, 
GBB/GIB models 
use bottom screw 
holes. 
Figure 10.  Bringing the EAS and the Actuator together. 
 
1
2.  Secure the EAS in place with the M5×25 screws 
provided. (See Figure 10).  
 
CAUTION:   
The EAS should not shift when it is 
correctly installed firmly against the face 
of the actuator.  
The installation is complete. 
 
Siemens Building Technologies, Inc. 
Page 3 of 5