Wegener Communications DVR395 사용자 설명서

다운로드
페이지 30
Page 12 
 
DVR395/DVR396-002 
Page 12 of 30 
installations, but especially in multi-service environments, should use high-quality shielded 
cables, with the shield grounded according to good engineering standards. 
1.4.1.2 Ferrite 
Installation 
For this installation, there are three ferrites that are larger than the others.  These should be used 
for the cables numbered 
6
7
, and 
8
 in the list below.  These are the relay cables, the video cable, 
and the S-Video cable.  The other five cables will normally have a smaller total diameter, and 
should fit into the smaller ferrites. 
These ferrites must be installed on cables attached to the following connectors: 
 Connector Ferrite Size 
1.  Audio 1 Left  
Small 
2.  Audio 1 Right 
Small 
3.  Audio 2 Left 
Small 
4.  Audio 2 Right 
Small 
5.  Serial Port 
Small 
6.  Alarm and Closure Relays. 
Large 
One ferrite for all wires to relays. 
7.  Video Large 
8.  S-Video Large 
The cables must pass through the ferrite and then loop around and pass through again.  See 
Figure 1
 (Page 11).  For proper results, the core should be positioned on the cable as close to the 
chassis connector as possible.  With minimal slack in the loop, the wiring alone should properly 
support the core.  No additional support should be necessary.