Hunter Fan 45003-01 Manual Do Utilizador

Página de 16
5
45003-01  •  07/02/2009  •  Hunter Fan Company
2 • Installing the Hanger Bracket
2-1.  Drill two pilot holes into the wood support structure through the 
outermost holes in the outlet box. The pilot holes should be 9/64” 
in diameter.
    Note: Your fan comes with four pre-installed neoprene noise 
isolators. 
2-2.  Thread the lead wires from the outlet box down through the hole 
in the middle of the hanger bracket.
2-3.  Align the slotted holes in the hanger bracket with the pilot holes 
you drilled in the wood support structure. For proper alignment 
use slotted holes directly across from each other. If you are 
installing the fan on an ANGLED ceiling, be sure to orient the 
hanger bracket as shown in Illustration 2-3 (left or right view).
    Note: The isolators should be flush against the ceiling.
2-4.  Place a flat washer on each of the two 3” screws and pass the 
screws through the slotted holes in the hanger bracket into the 
pilot holes you drilled. 
    Tighten the screws into the 9/64” pilot holes; do not use lubricants 
on the screws. Do not over tighten.
Flat Washer
3” Screw
Steps 2-2 – 2-4
Hanger 
Bracket
Isolator
Step 2-3 (Angled Ceiling Only)
OR
Ceiling Peak
Ceiling Peak
Large
Opening
Large
Opening
LEFT
RIGHT