Enviro 50-1033 Manual Do Utilizador

Página de 48
25
Figure 36: Cathedral Ceiling Support Box 
Installation.
Initial Installation
QUALIFIED INSTALLERS ONLY
Figure 37: Corner installation rear vented with 
snorkel.
Figure 38: Corner installation top vented.
C
ORNER
 I
NSTALLATIONS
:
Do not interfere with the structural integrity of the walls.
When rear venting if a 90° bend is used the maximum horizontal vent that can be used is 6” (152mm) 
and if a 45° bend is used the maximum horizontal vent that can be used is 12” (305mm). For installations 
with a 36” (915 mm) snorkel refer to Figure 37 and I
NITIAL
 I
NSTALLATION
 - V
ENT
 C
ONFIGURATIONS
 
AND
 R
ESTRICTOR
 
S
ETTINGS
. For other corner installations refer to Figure 38 and I
NITIAL
 I
NSTALLATION
 - V
ENT
 C
ONFIGURATIONS
 
AND
 
R
ESTRICTOR
 S
ETTINGS
.
5.  Using tin snips, cut the “Support Box” from the top corners 
down to the roof line, and fold the resulting flaps over the 
roof sheathing (Figure 36). Before nailing it in to the roof, 
run a bead of non-hardening mastic around the top edges 
of the “Support Box”, to make a seal between the box and 
the  roof.  Clean  out  any  combustible  material  from  the 
inside of the “Support Box”.
6.  Complete the cathedral ceiling installation by following the 
same procedures outlined in Steps 4 through 9 for I
NITIAL
 
I
NSTALLATION
 - V
ERTICAL
 I
NSTALLATION
.