Hampton Direct H15-NG1 Manual Do Utilizador

Página de 48
Hampton
®
 H15-1 Direct Vent Freestanding Gas Stove
27
4)  Assemble the desired lengths of Black Pipe 
and Elbows necessary to reach from the 
appliance adapter up through the support 
box and fl ashing to proper height as per 
Dia. 12, local codes.  Ensure that all pipe 
and elbow connections are in their fully twist 
lock position.
5)  Ensure vent is vertical and secure fl ashing to 
the roof  with roofi ng nails.  Slide the storm 
collar over the pipe section and seal with a 
mastic.
6)  Twist lock the vent cap on to the last sec-
tion.
Support Extensions - Round 
(RDSE) or Square (SQSE)
Steep pitched cathedral ceilings may require 
the use of a support extension. This piece fi ts 
down inside the support and can be adjusted to 
increase the support's length by up to 22". The 
extension is attached to the support using the 
eight metal screws provided.  Be sure there is 
at least a 2 inch overlap where the extension 
joins the support.
HIGH ELEVATION
This unit is approved in Canada for altitude to 
4500 ft. (CAN/CGA-2.17-M91). For Natural 
Gas installations above 4500 ft. follow current 
CAN/CGA-B149.1. 
GAS CONNECTION
The gas connection is a 3/8" NPT 90
o
 elbow. The 
gas line can be rigid pipe or to make installation 
easier, use a listed fl exible connector and/or cop-
per tubing if allowed by local codes. Since some 
municipalities have additional local codes it is 
always best to consult with your local authorities 
and the CAN/CGA B149 installation codes.
For USA installations follow local codes and/or 
the current National Fuel Gas Code, ANSI 
Z223.1.
When using copper or fl ex connectors use only 
approved fi ttings. Always provide a union so that 
gas lines can be easily disconnected for burner 
and/or valve servicing. Flare nuts for copper lines 
and fl ex connectors are  usually considered to 
meet this requirement.
CATHEDRAL CEILINGS
Round Support (RDS) &
Square Support (SQS)
If your home has a cathedral ceiling (no attic 
space between the ceiling and the roof), install 
the chimney and support as follows.
1)  Situate the chimney in a convenient loca-
tion as near as possible to the appliance 
outlet.  Cut and frame a hole in the roof for 
the support. The sides of this hole must be 
vertical with 1 1/4" clearance.
2)  Place the support in the opening. Lower it 
to the correct height as determined by the 
table and diagram below.
 
Using a level, make sure the support is 
vertical.  If the support extends above the 
roof, cut it fl ush with the top of the roof.  
Nail the support to the frame opening using 
(8) 3" spiral nails or #8 x 1-1/2" screws.
Note:  If you are using a 6" square support 
you may fi nd it diffi cult to screw it 
in place because it is fairly small 
inside.
 Simpson 
Dura-Vent 
has 
provided 
angle 
brackets with this support which can be 
screwed to the outside of the support 
box and nailed to surrounding framing as 
required.  Use a minimum of four #8 x 1/2" 
screws per bracket.  In some cases these 
brackets may need to be trimmed (e.g.: 
to fi t under a fl ashing).  Place the Finish 
Collar around the support and fasten it to 
the ceiling using the screws provided.
3)  Use appropriate roof fl ashing.  Place the 
fl ashing under the upper shingles and on top 
of the lower shingles approximately half of 
the fl ashing should be under the shingles.  
    Slope 
"X"
0/12 - 
2/12 
4"
2/12 - 
7/12 
5-1/2"
7/12 - 
12/12 
6-3/4"
12/12 - 24/12 
7-1/2"
24/12+  
12-1/2"
IMPORTANT: ALWAYS CHECK FOR 
GAS LEAKS WITH A SOAP AND 
WATER SOLUTION OR GAS LEAK 
DETECTOR. DO NOT USE OPEN 
FLAME FOR LEAK TESTING.
Note:  Prior to any pressure testing of the gas 
supply piping system that exceeds 
test pressures of 1/2 psig, this ap-
pliance must be disconnected from 
the piping system.  If test pressures 
equal to or less than 1/2 psig are used 
then this appliance must be isolated 
from the piping system by closing 
its individual manual shut-off valve 
during the testing.
H15-NG1 System Data 
For 0 to 4500 feet altitude
Burner Inlet Orifi ce Sizes: 
#47
 
 
                  
Max. Input Rating  18,000 
Btu/h 
Min. Input Rating 
10,500 Btu/h 
 
Supply Pressure min.5.0" 
w.c.
 
 
 
Manifold Pressure  
 (High)
 3.8"+/- 
0.2"w.c.
 
H15-LP1 System Data 
Conversion Kit# 380-969
For 0 to 2000 feet altitude
Burner Inlet Orifi ce Sizes: 
#55 
                 
Max. Input Rating 
18,000 Btu/h
Min. Input Rating 
10,600 Btu/h
For 2000 to 4500 feet altitude
Burner Inlet Orifi ce Sizes: 
#56 
                 
Max. Input Rating 
15,500 Btu/h
Min. Input Rating 
8,200 Btu/h
Supply Pressure min.12.0" 
w.c.
Manifold Pressure  
 (High)
  
11"+/- 0.2" w.c.
INSTALLATION