Enviro 1200 Freestanding Manual Do Utilizador

Página de 45
23
Installation
I
NSTALLATION
 
OF
 A L
ISTED
, F
ACTORY
 B
UILT
 C
HIMNEY
 - F
REESTANDING
:
This is a generic set of instructions; always follow the chimney manufacturer’s instructions 
explicitly. Also refer to “R
ECOMMENDED
 H
EIGHTS
 F
OR
 F
LUE
 P
IPE
”.
1.  Set floor protector and stove in location in accordance with the “C
LEARANCES
 T
O
 C
OMBUSTIBLES
 - 1200 
Hearthpad
Floor
Pedestal
Woodstove
Optional
fan
Outside air connection
through wall or floor
Ceiling support
Ceiling
Radiation shield
Insulated chimney
Rain cap/
Spark arrestor cap
Roof flashing
Roof
Attic
radiation shield
Minimum air space in
accordance with
chimney manufacturer.
Chimney
connector
Storm Collar
F
REESTANDING
”  or  “C
LEARANCES
  T
O
  C
OMBUSTIBLES
  - 
1700 F
REESTANDING
”.
2.  Mark  the  position  for  the  ceiling  hole  by 
suspending a plumb bob from the ceiling over 
the exact center of your stove flue and mark 
a spot on the ceiling to indicate the center of 
the chimney. 
3.  Move  this  location,  if  necessary,  to  avoid 
floor  joists,  ceiling  rafters,  electrical  wiring 
and plumbing while still maintaining required 
clearances. If floor joists or ceiling rafters must 
be cut they must be made structurally sound 
again. Install chimney according to chimney 
manufacturers  instructions.  A  chimney 
connector cannot pass through an attic or roof 
space, closet or similar concealed space, or a 
floor, ceiling, wall or partition of combustible 
construction. In Canada, if passage through a 
wall  or  partition  of  combustible  construction 
is  desired,  the  installation  shall  conform  to 
CAN/CSA-B365  Installation  Code  for  Solid-
Fuel Burning Appliances and Equipment and 
NFPA 211 Standard for Chimneys, Fireplaces, 
Vents, and Solid Fuel-Burning Appliances.
4.  Mark the hole for the outside air kit.
5.  Move the stove out of the way.
6.  Cut a pilot hole in the ceiling.
7.  Cut  a  hole  for  the  ceiling  penetration 
components  and  frame  in  the  sides  of  the 
hole in both the ceiling and roof. Check, and 
follow  chimney  manufacturer’s  instructions 
for all of these steps.
8.  Install the support box and chimney through 
the  roof.  Install  the  slip  section  for  the 
chimney connector.
9.  Slip  the  roof  flashing  over  the  chimney  and 
secure to the roof, being careful to keep the 
pipe  centered  in  the  opening.  To  meet  the 
code, the chimney must extend above the roof 
penetration at least 3 feet (91.4 cm), and in 
any area within 10 feet (304.8 cm) of the roof 
Figure 23: Standard Vertical Installation.
Figure 22: Roof Clearances.