Jacuzzi J - 400 Manual Do Utilizador

Página de 104
Page 79
J-400 Series
Red (L2)
Pigtail
Neutral Bus
Ground
Black (L1)
Green
Main
Service
Panel
with
GFCI
2-Pole 
GFCI
Breaker
Ground/Bonding Lug**
2-Pole Circuit Breaker with 2-Wire Grounded Load Connection
(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)
White (N)
Black (L1)
Red (L2)
240 VAC
No Load Neutral Wire
Note: service disconnect not 
shown in this diagram.  
The control box TB1 terminal 
position varies between models.
Red (L2)
Red (L2)
Pigtail
Neutral Bus
Ground
Black (L1)
Black (L1)
Green
GFCI Sub Panel*
Main Panel*
2-Pole 
GFCI
Breaker
Ground/Bonding Lug**
No Load Neutral Wire
Main Panel with Secondary GFCI Shut-Off Box Using a
2-Pole GFCI Breaker with 2-Wire Grounded Connection
(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)
White (N)
Green (Ground)
*GFCI Sub Panel commonly 
used when recommended GFCI 
does not install in Main Panel.
Note: service disconnect not 
shown in this diagram.  
The control box TB1 terminal 
position varies between models.
B
A
240 VAC
18.0  Typical spa wiring Diagrams 
18.1  wiring diagram for north american 60 Hz models Only