Arboria Pyramid Trellis Manual Do Utilizador

Página de 4
P age  2 
 STEP 1: ATTACHING THE  FIRST SIDE TO THE PYRAMI D CA P 
Place the solid cedar pyramid cap on its side on your work surface. Place the “point” of one triangular trellis panel on top of 
the connector stub at the base of the pyramid, with the cross-members on the underside of the trellis panel (facing down). 
 
Line up the right edge of the right-hand side of the trellis piece so that it is exactly flush with the right side of the connector 
stub (see Diagram 1). The left edge of the left-hand side of the trellis piece should be flush with the left edge of the pyramid 
(
not
  the connector stub!). 
 
Start screws in the two holes at the top of the trellis piece. 
DIAGRAM 1 
Connector 
stub 
Right edge of frame 
flush with edge of 
connector stub 
Connector 
stub 
Holes down 
left edge 
Holding the trellis end firmly against the base of the pyramid cap and with  its right edge flush to the connector stub, drive 
in the right-hand screw. Then drive in the left screw, again keeping a snug fit.