Arboria Pyramid Trellis Manual Do Utilizador

Página de 4
Page 3 
 
STEP 2: ATTACHING THE SECO ND SI DE PANEL
 
 
STEP 3: COMPLETING THE ASSEMBLY
 
Stand the first frame, with pyramid cap attached, onto its base. Place a second frame, with cross-members inward, on its 
left. Leaning the two tops together, let the upper end of the second panel rest against the connector stub. You will see that 
they can now stand unsupported (see Diagram 2). 
 
Moving around to face the second side frame, line up its top right edge against the side of the first frame, with the pyramid 
cap resting on the top (Diagram 2). 
Holding the two sides firmly in this position, 
drive the right-hand screw into the connector 
stub. Then drive the second screw, taking care to 
hold the pyramid snugly against the frame top. 
 
Holding the two trellis pieces firmly 
together at the corner and squarely 
aligned, drive a screw through the 
uppermost hole along the left side of 
the first piece into the edge of the 
second panel. This will provide some 
stiffness as you complete the  
assembly. 
DIAGRAM 2 
Outside edges flush 
Hold 
edges  
together 
Drive 
screw 
squarely 
into edge 
First 
frame 
Second 
frame 
Add the remaining two trellis panels in the same manner. You can secure the sides together at the corners as you progress 
or wait until all sides have been attached to the cap. 
 
NOTE: 
This pyramid is sufficiently sturdy for its purpose of supporting growing plants, but it is not intended to support 
concentrated weight on its cross-members. 
IT SHOULD NOT BE CLIMBED ON! 
 
While pyramids are inherently stable, we recommend anchoring your trellis in place. The easiest way is to tie it to at least 
two stakes at the corners.