Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1119
PMS-PRNT/JNL-PRNT (PMS Printer Link) 
10
data module, and the printer device. Enter 
status data <extension>
 and 
verify that the data extension of the printer device is in the in-service/idle 
state. If the data extension is not available, then refer to the 
 section for resolution.
d. Link idle timer; link comes down. This error indicates that the printer 
device is in an off-line state, for example, paper jam or paper out for a 
printer device. Check the printer device and act promptly to put it back to 
on-line state. Enter 
test journal wakeup-log|pms-log
 command to set up 
the printer link.
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Link 
Retry Test
, for example, you may also clear errors generated from other tests in 
the testing sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external 
printer device. If the link has been disconnected already, this test just returns 
PASS. All resources allocated for a PMS Printer Link are released after this test.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Link Tear Down Test (#213)
X
D
Link Retry Test (#215)
X
X
ND
Table 10-330.
TEST #213 Link Tear Down Test 
Error 
Code
Test 
Result
Description/ Recommendation
40
ABORT
Internal system error
50
ABORT
Internal system error
1. Retry the command at 1minute intervals a maximum of 5 times.
Continued on next page