Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1154
PR-MAINT (Maintenance Processor) 
10
Error Log Entries and Test to Clear Values
Notes:
a. The MTP Reset Test (#101) has failed.
b. The MTP Sanity Handshake Test (#106) has failed.
c. The MTP Analog Loop Around Test (#103) has failed.
d. The MTP Dual Port Ram Test (#104) has failed. An error of 769 with an aux 
data of 5 indicates a hardware problem and testing will not clear it. The 
circuit pack should be replaced.
e. The MTP Outpulse Relay Test (#102) has failed.
f. The MTP Manager I Loop Around Test (#228) has failed.
g. The MTP Aux Loop Around Test (#229) has failed.
NOTE:
Refer to the FAIL section of each test that fails for further instructions.
1.
You must manually repeat the command with the "long" option the designated number of times from 
the administration terminal or from a remote administration terminal because the Sanity Timer Test 
(#83) logs you off.
2.
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the 
appropriate test description and follow the recommended procedures.
Table 10-344.
Maintenance/Tape Processor Error Log Entries
Error 
Type
Aux 
Data
Associated Test
Alarm
 Level
On/Off
 Board
Test to Clear Value
1
0
2
0
Any
Any
Any
test processor a/b sh r 1
1 (a)
Any
MTP Reset Test (#101)
MIN
ON
test processor a/b l r 3
257 (b)
Any
MTP Sanity Handshake Test 
(#106)
test processor a/b r 2
513 (c)
Any
MTP Analog Loop Around 
Test (#103)
MIN
ON
test processor a/b r 8
769 (d)
Any
MTP Dual Port Ram Test 
(#104)
MIN
ON
test processor a/b l r 3
1025 (e)
Any
MTP Outpulse Relay Test 
(#102)
MIN
OFF
test processor a/b r 5
1537  (f)
Any
MTP Manager I Loop Around 
Test (#228)
MIN
ON
test processor a/b r 3
1793 (g)
Any
MTP Aux Loop Around Test 
(#229)
MIN
ON
test processor a/b r 3