Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Packet Bus Fault Isolation and Correction 
Page 9-18
The Maintenance/Test Circuit Pack (TN771D) 
9
Special Precaution Concerning the TN771
NOTE:
A new TN771 Maintenance/Test circuit pack must be taken to the customer 
site whenever the following is true:
Maintenance/Test Packet Bus port indicates that a Packet Bus fault is 
present.
NOTE:
Such a fault is indicated by a Major or Minor alarm against the 
Packet Bus. A Major alarm is indicated in the error log by Error Type 
513, while a Minor alarm is indicated by Error Type 2049.
Test #572 of the PKT-BUS test sequence is the only test that fails.
This precaution is taken because certain failures of the Maintenance/Test circuit 
pack can appear as Packet Bus failures. To ensure that the problem is indeed 
with the Packet Bus, implement the following steps:
1.  Refer to the M/T-PKT Maintenance documentation in 
. Correct any problems with the 
TN771 Maintenance/Test Packet Bus port as described in that section. If 
the TN771 Maintenance/Test circuit pack is replaced during the correction 
process, enter the 
test pkt P long
 command to determine if the Packet 
Bus faults have been resolved. If there are still Packet Bus problems, 
correct them by using the procedures in the sections that follow.
2. If the Maintenance/Test circuit pack was not replaced, enter the 
test pkt P
 
command. Record the results (PASS/FAIL/ABORT) and error codes for 
Test #572.
3. Enter the 
status system P
 command. Record the information listed for the 
Packet Bus.
4. Busyout the Maintenance/Test circuit pack by entering the 
busyout board 
PCSS
 command.
5. Replace the Maintenance/Test circuit pack with the new circuit pack.
6. Release the Maintenance/Test circuit pack by entering the 
release board 
PCSS
 command.
7. Enter the 
test pkt P
 and 
status system P
 commands as described in 
Steps 2 and 3.