Lucent Technologies R5SI Manual Do Utilizador

Página de 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-10
AC-POWER 
10
Error Log Entries and Test to Clear Values
Refer to the appropriate test description and follow the recommended 
procedures.
AC Power Query Test (#78)
1.
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence.
Table 10-3.
AC Power Error Log Entries
Error 
Type
Aux 
Data
Associated Test
Alarm 
Level
On/Off 
Board
Test to Clear Value
0
1
0
Any
Any
Any
test environment P sh r 1
513
Any
AC Power Query 
Test (#78)
WARNING
OFF
test environment P sh r 1
Table 10-4.
TEST #78 AC Power Query Test 
Error 
Code
Test 
Result
Description / Recommendation
1000
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2000
ABORT
Response to the test request was not received within the allowable time 
period.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If the test continues to ABORT with Error Code 2000, check for system 
powering problems with the A carrier (PPN or EPN). Resolve all 
DC-POWER alarms. Then, repeat the test.
3. If the test continues to ABORT with a 2000 Error Code, resolve all 
DUPINT (Duplication Interface) errors in a high or critical reliability 
system PPN, PR-MAINT (Maintenance/Tape Processor) errors in a 
standard PPN, or MAINT (EPN Maintenance circuit pack) errors in an 
EPN. Repeat the test.
2029
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page