Agilent Technologies 85225F Manual Do Utilizador

Página de 148
108
Installation and User’s Guide
4
Servicing the System
 
To package the system for transport
Follow these instruction to package the system in a shipping crate.
To package the system for transport
Step
Note
Place the packaging base in an 
unobstructed work area.
Remove the lag bolt from one side 
of the retaining piece.
Swing unbolted end of retaining 
piece outward.
Attach loading ramp.
Roll rack cabinet up ramp face first 
until it is fully seated on base.
Remove ramp.
Swing retaining piece back to 
original position.
Secure retaining piece with bolt.
Secure rack cabinet to base using 
retaining brackets inserted in the 
slot located on each side of the 
packaging base.
10 Secure retaining brackets with bolt 
and tighten.
11 Place antistatic bag over rack 
cabinet.
12 Place cardboard/foam top cap on 
top of rack cabinet.
13 Place folded ramp on top cap.
14 Place crate side panel and crate 
front panel on to base (the side 
panel, with wooden cleat, goes on 
the outside of the front panel).
15 Connect both panels by hammering 
klimps approximately every two 
feet along the vertex.
16 Place the lid in position and attach 
to all side panels and front panel 
using klimps.