Agilent Technologies 85225F Manual Do Utilizador

Página de 148
112
Installation and User’s Guide
A
Enhancing Measurement Accuracy
 
To enhance measurement accuracy
Follow these instructions to enhance the accuracy of your 
measurements.
To enhance measurement accuracy
Step
Action
Notes
Inspect device 
connections for foreign 
materials or connector 
damage.
Prior to connecting the DUT, inspect the 
bias network and semi-rigid RF cable 
connectors for foreign materials or 
damage.
Replace any damaged connectors.
Before using connectors for a critical 
measurement, inspect the connector 
interfaces with a microscope (~20X). 
Look for dirt, contaminants, dented or 
scratched outer conductor mating 
surfaces, and damaged center 
conductors. 
Clean the connectors.
Remove the systems power cord from the 
power supply or place the supply breaker in 
the tripped position.
Move the connectors to a well ventilated 
area.
Use a swab dipped in clean isopropyl 
alcohol to cleanse the outer conductor 
mating surfaces and the ends of the center 
conductors. 
Blow off the remaining alcohol with clean 
compressed air. 
Allow adequate time for the alcohol fumes 
to disperse before activating the system.
Be careful not to let the alcohol get on 
the insulator bead, as this may damage 
the bead. 
Be careful not to exert too much force 
on the center conductors, as they may 
be damaged.
Compressed air can reduce the 
temperature of connectors 
dramatically, and this can have a 
significant effect upon the performance 
of calibration and verification 
components. 
If the connector components being 
cleaned are to be used in a critical 
measurement application, allow the 
temperature of these components to 
stabilize prior to use.
Ensure proper system 
warm-up time.
Switch on line power to all of the system 
components.
Allow at least 1 hour warm-up prior to 
making measurements.
Follow the procedure in 
Do not switch off line power to the 
system unless the system will not be 
used for an extended period of time.
Ensure a proper and 
constant temperature in 
the measurement 
environment.
Operate the system within an ambient 
temperature range of 25
°
C, ±5
°
C.
After system measurement calibration, 
hold the ambient temperature of the 
measurement environment to ±1
°
C of the 
ambient temperature at the time of 
calibration.
Install heating and cooling systems as 
necessary to maintain proper ambient 
temperature in the measurement 
environment.