McDATA 3000 Manual Do Utilizador

Página de 428
B-1
Installation and Cabling
This appendix provides installation and cabling information for the 
UltraNet Edge 3000.
Overview
The UltraNet Edge 3000 host and network I/O hardware components 
have been pre-installed. You are responsible for the following:
Review the site-preparation requirements in 
 before installing the UltraNet Edge 3000 hardware.
Decide on unit placement.
Unpack and inspect the UltraNet Edge 3000 unit.
Take an inventory of UltraNet Edge 3000 components.
Ensure that ESD procedures are followed, see “Cables and 
Equipment” on page -14.
If the UltraNet Edge 3000 is placed in a rack mount, attach 
mounting brackets to the front corners of the unit.
Mount UltraNet Edge 3000 on the equipment rack (or place in 
tabletop position).
Acquire and attach the appropriate cable types and lengths.
NOTE: 
After hardware installation is complete, use the UltraNet 
ConfigManager configuration application to perform your network 
configurations.