APC Power Supply Manual Do Utilizador

Página de 46
InfraStruXure Site Planning, Installation, Start-Up
29
Start-Up Procedure
Safety warnings
Ensure that all power is off
Only APC Field Service Engineers or qualified, APC-trained personnel may 
perform a system start-up.
Before you proceed, ensure that power is off by following the procedure in this 
section.
1. Open (turn OFF) the PDU main input.
2. Set the upstream input circuit breaker (utility or 
UPS) to the OFF or Locked Out position.