Manual Do Utilizadoríndice analíticoSafety9Overview9Save these instructions9Safety symbols used in this manual9Cross-reference symbols used in this manual9Warnings10Installation/Maintenance10Maintenance performed while the PDU is receiving input power10Total power off procedure10Register equipment with the fire department10Site Preparation11Dimensions11InfraStruXure PDU11NetShelter VX Seismic Enclosure11NetShelter VX Enclosure12Space Considerations13Weight Considerations14Heat Output15Electrical Requirements and Specifications16Procedures requiring a licensed electrician16Electrical requirements16Basic Installation Procedure17Installation Procedures19Join Adjacent Enclosures and Bolt Enclosures to the Floor19Join adjacent enclosures19Bolt Enclosures to the Floor19Ensure Total Power Off20Connect the Power Source to the PDU21Access the PDU Main Input switch21Attach conduit to the PDU for the input conductors21Install a circuit breaker23Route the input conductors to the main input circuit switch23Torque specifications and tools required23Connect input conductors24Connect User Contact Inputs and Output Relays to the User Connection Plate25Overview25How to connect contacts to the PDU Monitoring Unit26Install Shielding Troughs, Shielding Partitions, and Cable Ladders27Shielding Troughs and Shielding Partitions for overhead wiring along rows27Cable Ladders for overhead wiring across rows28Install InfraStruXure Rack-Mount Devices29Install the Rack Automatic Transfer Switches (ATS)29Install the Rack Power Distribution Units (PDU)29Install the InfraStruXure Manager and Hub (or Switch)29Install the APC Environmental Monitoring Unit29Route and Attach Overhead Wiring30Route and attach power cables to equipment racks30Wiring Under the Floor (Alternative)33Route Data Cables to the InfraStruXure Manager Hub (or Switch)35Connect network cables to InfraStruXure components35Route network cables to the InfraStruXure Manager hub (or switch)36Start-Up Procedure37Safety warnings37Ensure that all power is off37Apply power to the system38Configuration41Configure the InfraStruXure Manager41Appendix A—System Operation43How to Apply Power to the System43How to Ensure Total Power Off44Tamanho: 1 MBPáginas: 46Language: EnglishAbrir o manual