Nortel Networks 10BASE-T Manual Do Utilizador

Página de 330
Troubleshooting
309985-C Rev 00
4-5
 
Normal Power-Up Sequence
In a normal power-up sequence, the LEDs appear as follows:
1.
After power is applied to the switch, the Pwr (Power) LED turns on within 5 
seconds.
2.
The switch initiates a self-test, during which the port LEDs display various 
patterns to indicate the progress of the self-test.
3.
Upon successful completion of the self-test (within 10 seconds after power is 
applied), the Status LED turns on.
4.
The remaining port LEDs indicate their operational status, as described in 
.
Advertencia:
 A fin de evitar daños personales por corrientes eléctricas 
peligrosas, no desmonte nunca la cubierta superior de este dispositivo. Los 
componentes internos no son reparables por el usuario.
Avvertenza:
 Per evitare lesioni fisiche dovute a scariche pericolose di 
corrente, non rimuovere mai il coperchio superiore del dispositivo. I 
componenti interni non possono essere manipolati dall'utente.
Table 4-2.
Corrective Actions
Symptom
Probable cause
Corrective action
All LEDs are off.
The switch is not receiving AC 
power.
Verify that the AC power cord is fastened securely 
at both ends and that power is available at the AC 
power outlet
The fans are not operating or 
the airflow is blocked, causing 
the unit to overheat.
Verify that there is sufficient space for adequate 
airflow on both sides of the switch.
(continued)