McDATA 3232 Manual Do Utilizador

Página de 612
2
Task 3: Unpack, Inspect, and Install the Switch
2-13
Installation Tasks
Unpack and Inspect 
the Switch
Unpack and inspect the switch:
When you remove the switch from the carton, do not rest it on its 
rear panel while examining it. To do so may break the FRU handles.
1. Inspect the shipping container(s) for damage caused during 
transit. If a container is damaged, ensure a representative from 
the freight carrier is present when the container is opened.
2. Unpack the shipping container(s) and inspect each item for 
damage. Save all shipping and packing materials.Ensure that all 
items on the enclosed shipping list are in each container.
3. If any items are damaged or missing, customers should contact 
the McDATA solution center as follows:
Phone: (800) 752-4572 or (720) 566-3910
Fax: (720) 566-3851
E-mail: support@mcdata.com
.
Desktop Installation
To install and configure the switch on a desktop:
1. Remove the backing from the four adhesive rubber pads and 
apply the pads to the underside of the switch. Ensure the pads are 
aligned with the scribed circles at each corner.
2. Position the switch on a table or desktop as directed by the 
customer. Ensure:
— Grounded AC electrical outlets are available.
— Adequate ventilation is present.
— Areas with excessive heat, dust, or moisture are avoided.
— All planning considerations are met. Refer to the McDATA 
Products in a SAN Environment Planning Manual (620-000124).
3. Verify that all FRUs are installed as ordered.
4. Verify that the SFP optical transceivers are installed as required 
for your installation.
5. Connect the U.S. or country-specific (optional) AC power cords to 
the right (PS0) and left (PS1) receptacles at the rear of the chassis.