McDATA 3232 Manual Do Utilizador

Página de 612
2
2-14
Installation Tasks
A McDATA-supplied power cord is provided for each switch 
power supply. To prevent electric shock when connecting the 
switch to primary facility power, use only the supplied power 
cord(s), and ensure the facility power receptacle is the correct 
type, supplies the required voltage, and is properly grounded.
6. Connect the remaining ends of the AC power cords to separate 
facility power sources that provide single-phase, 120 to 240 volts 
alternating current (VAC) current. This provides power 
redundancy.
7. Turn on the power. Two power switches are on the back of the 
unit.The unit powers on and performs power-on self-tests 
(POSTs). During POSTs:
a. The green power (PWR) LED on the front panel illuminates.
b. The amber system error (ERR) LED on the front panel blinks 
momentarily while the switch is tested.
c. The green LEDs associated with the Ethernet port blink 
momentarily while the port is tested.
d. The green and amber LEDs associated with the ports blink 
momentarily while the ports are tested.
8. After successful POST completion, the green power (PWR) LED 
remains illuminated and all other front panel LEDs extinguish.
9. If a POST error or other malfunction occurs, go to 
 on page 3-6 to isolate the problem.
Rack-Mount 
Installation
To install the switch in a customer-supplied equipment rack, refer to 
the McDATA Rack-Mount Kit Installation Instructions.
Task 4: Configure Network Information
The Sphereon 3032/3232 Switch is delivered with the following 
default network addresses:
MAC address -
 the media access control (MAC) address is 
programmed into FLASH memory on the CTP card at the time of 
manufacture. The MAC address is unique for each switch, and 
should not be changed. The address is in xx.xx.xx.xx.xx.xx format, 
where xx is a hexadecimal pair.