McDATA IPS4300 Manual Do Utilizador

Página de 188
2
2-2
McDATA Sphereon 4300 Fabric Switch Installation and Service Manual
Installation Tasks
Summary of Installation Tasks
 summarizes installation tasks for the product. The table 
describes each task, states if the task is optional, and lists the page 
reference.
Task 1: Verify Installation Requirements
Verify the following requirements are met prior to product and 
management interface installation. Ensure:
A site plan is prepared, configuration planning tasks are 
complete, planning considerations are evaluated, and related 
planning checklists are complete. Refer to McDATA Products in a 
SAN Environment - Planning Manual 
(620-000124) for information.
Fibre Channel SAN design and director, fabric switch, and SAN 
router device connectivity are evaluated, and the related planning 
worksheet is complete. Refer to the McDATA Products in a SAN 
Environment - Planning Manual 
(620-000124) for information.
Table 2-2
Installation Task Summary
Task Number and Description
Required or Optional
Page
Required.
Required.
Required.
Configure if connecting multiple switches or connecting 
switch to a public LAN.
Required.
Perform task to configure zoning.
Perform task to connect switch to a Fibre channel 
fabric.
Required.