McDATA IPS4300 Manual Do Utilizador
2
2-2
McDATA Sphereon 4300 Fabric Switch Installation and Service Manual
Installation Tasks
Summary of Installation Tasks
summarizes installation tasks for the product. The table
describes each task, states if the task is optional, and lists the page
reference.
reference.
Task 1: Verify Installation Requirements
Verify the following requirements are met prior to product and
management interface installation. Ensure:
management interface installation. Ensure:
•
A site plan is prepared, configuration planning tasks are
complete, planning considerations are evaluated, and related
planning checklists are complete. Refer to McDATA Products in a
SAN Environment - Planning Manual (620-000124) for information.
complete, planning considerations are evaluated, and related
planning checklists are complete. Refer to McDATA Products in a
SAN Environment - Planning Manual (620-000124) for information.
•
Fibre Channel SAN design and director, fabric switch, and SAN
router device connectivity are evaluated, and the related planning
worksheet is complete. Refer to the McDATA Products in a SAN
Environment - Planning Manual (620-000124) for information.
router device connectivity are evaluated, and the related planning
worksheet is complete. Refer to the McDATA Products in a SAN
Environment - Planning Manual (620-000124) for information.
Table 2-2
Installation Task Summary
Task Number and Description
Required or Optional
Page
Required.
Required.
Required.
Configure if connecting multiple switches or connecting
switch to a public LAN.
switch to a public LAN.
Required.
Perform task to configure zoning.
Perform task to connect switch to a Fibre channel
fabric.
fabric.
Required.