Husqvarna PG530 Manual Do Utilizador
8
- English
The machine can be divided into two main parts. These
can be identifi ed as follows:
can be identifi ed as follows:
1. Chassis/Frame section – comprising handle bars,
electrical cabinet, steel frame and wheels.
2. Head – comprising of motors, cover, grinding/satel-
lite/ planetary heads and internal components.
The machine has been manufactured to allow move-
ment between the chassis and head via the connection
point at the lifting lugs and chassis pins. This move-
ment is important during the grinding process as it
creates a “fl oating” effect for the head.
ment between the chassis and head via the connection
point at the lifting lugs and chassis pins. This move-
ment is important during the grinding process as it
creates a “fl oating” effect for the head.
The fl oating gives the head a self-leveling effect, negat-
ing the need to adjust the height of the head as the
machine passes over fl oor areas with different slopes
or undulations.
ing the need to adjust the height of the head as the
machine passes over fl oor areas with different slopes
or undulations.
Control panel
The control panel consists of a number of switches and
dials giving 6 separate controls (see picture).
dials giving 6 separate controls (see picture).
Power - This button, when depressed, will turn on
power supply to the unit when the EMERGENCY
STOP button has been released.
power supply to the unit when the EMERGENCY
STOP button has been released.
Emergency Stop - When pushed will immediately
shut down machine by totally stopping power supply to
drives/ frequency converters in electrical cabinet.
shut down machine by totally stopping power supply to
drives/ frequency converters in electrical cabinet.
Disc Speed - Speed control for grinding heads and
planetary head.
planetary head.
Fwd/Rev (Red) - Direction control for grinding heads
and planetary head.
and planetary head.
Reset - Will clear fault function/error message on drive/
frequency converter (located in electrical cabinet) in
case of fault occurring.
frequency converter (located in electrical cabinet) in
case of fault occurring.
Stop/Run - To start or stop machine during normal
operation.
operation.
IMPORTANT!
It is important to use the STOP/RUN switch
to control the running of the machine, not
the EMERGENCY STOP button. Each time
the EMERGENCY STOP button is pressed
it shuts down the drive/frequency converter.
Frequently powering up and down of the
drive/frequency converter will reduce the life
span of the drive/ frequency converter.
to control the running of the machine, not
the EMERGENCY STOP button. Each time
the EMERGENCY STOP button is pressed
it shuts down the drive/frequency converter.
Frequently powering up and down of the
drive/frequency converter will reduce the life
span of the drive/ frequency converter.
IMPORTANT!
Planetary head and grinding heads are set
to both turn in the same direction (i.e. both in
clockwise rotation or both in counter-clock-
wise rotation).
to both turn in the same direction (i.e. both in
clockwise rotation or both in counter-clock-
wise rotation).
Clockwise rotation of speed control will in-
crease speed of planetary head and grinding
heads.
crease speed of planetary head and grinding
heads.
Control panel
What is what
Grinding satellite/ heads
Planetary head
Dust extraction port