C. Sequence of Operation
The steps in the sequence are as outlined below. When power is supplied, the power 
switch is in the "ON" position, the door switch is engaged, and the control switch is in the 
"ICE" position, the "POWER" LED on the control board comes on.  
1. Fill Cycle
WV opens and the reservoir fills with water until UF/S closes. Note: GM will not start 
unless UF/S is closed. For details, see "IV. Service Diagnosis".
2. Ice Purge Cycle (60 seconds)
"GM" LED is on. WCR energizes, closing the low water safety circuit and de-energizing 
the WV. GM and GMPR energize. GM runs for 60 seconds to clear any ice from the 
evaporator. 
3. Freeze Cycle
"COMP", "GM" LEDs are on. Comp and FMS energize. As the water in the evaporator 
cools, ice starts forming within 4 to 6 minutes. This time frame depends on the inlet water 
and ambient temperature conditions. UF/S and LF/S operate WV as needed to continue 
the ice making process. This continues until BC shuts the icemaker down or power is 
turned off to the icemaker. 
4. Drain Cycle
1 hour DT activates, "FLUSH" LED is on after 150 second shutdown sequence. Comp 
and FMS de-energize 90 seconds after the 1 hour DT activates, GMPR and GM 
de-energize 60 seconds later. DV then energizes and remains energized for 0 minutes. 
5. Shutdown
BC is activated and a 150 second shutdown sequence begins. After BC has been 
open for 90 seconds, Comp and FMS de-energize, AM energizes for 0.6 seconds, and 
60 seconds later GM de-energizes. 
Legend:
 AM–agitating motor; BC–bin control; Comp–compressor; DT–drain timer;  
 
   
 
FMS–self-contained fan motor; GM–gear motor; GMPR–gear motor protect  
 
    
 relay; 
LF/S–lower float switch; UF/S–upper float switch; WCR–water control    
   
 relay; 
WV–inlet water valve