Hoshizaki DCM-500BWH-OS Manual Suplementar

Página de 69
13
Legend:
BC 
- bin control
Comp 
- compressor
DC - 
drain cycle
DT - 
drain timer
DV
 - drain valve
FMS 
- self-contained fan motor
FT 
- fill timer (low water safety) 
GM 
- gear motor
GMPR - 
gear motor protect relay
 
LF/S 
- lower float switch
UF/S
 - upper float switch
WCR 
- water control relay
WV 
- inlet water valve
Components Energized when the Control Switch is in the "DRAIN" Position
The "DRAIN" position on the control switch is used when cleaning and sanitizing the unit. This allows 
cleaner and sanitizer to drain from the reservoir and evaporator assembly. When switching to the "DRAIN" 
position during the freeze cycle, the drain valve does not energize until the 150 second shutdown sequence 
terminates (
. Shutdown & Restart).
Note: To bypass the 150 second shutdown sequence, move the power switch to the "OFF" position, place the
control switch in the "DRAIN" position, then move the power switch back to the "ON" position.
UF/S
 open 
LF/S
 open (WV on)
WCR
 off
FT
 started (90 sec.)
WV
 on
Comp
 continues
FMS
 co
ntinues
GM
 continues
GMPR
 continues
 DCM-500BAH(-OS), DCM-500BWH(-OS) Sequence Flow Chart and Component
 Operation
1. Startup
2. Ice Purge Cycle
WV
 on
LF/S
 closed
UF/S
 closed (WV off)
WCR
 on
WV 
off
GM
 on
GMPR
 on
Comp
 on
FMS 
on
WCR
 continues
GM
 continues
GMPR
 continues
Power switch "ON"
Control switch in "ICE"
1. Fill Cycle
3. Freeze Cycle
Refill 
(90 seconds)
LF/S
 closed 
UF/S
 closed (WV off) 
WCR
 on
FT
 off (90 sec.)
WV
 off
Comp
 continues
FMS 
continues
GM
 continues
GMPR
 continues
Low Water Safety
UF/S 
open
FT 
exceeded
Comp
 continues
FMS 
continues
GM
 continues
GMPR
 continues
WV 
continues
Comp
 off
FMS 
off
WV 
continues
GM
 continues
GMPR
 continues
GM
 off
GMPR
 off
WV 
continues until 
UF/S
 closes
90 seconds 
60 seconds 
If refill > 90 sec. 
FT
, 150 second 
shutdown sequence  begins
60 seconds
150 sec. Shutdown Sequence 
UF/S
 open
60 seconds
2. Shutdown & Restart
90 seconds
1
Bin Full 
     
 
Comp
 off
FMS 
off
GM
 continues
GMPR
 continues
GM 
off
GMPR
 off
DV
 on (
DC 
only)
3. Icemaker is Off
BC
 open or
 DC 
starts
Comp
 continues
FMS
 continues
GM
 continues
GMPR
 continues
2. Ice Purge Cycle 
4. Ice Level Lowered 
    See "1. Fill Cycle" above 
150 seconds
BC 
closed
or
20 Min. DT
 off (
DC
 only)
DV 
off (
DC
 only)
12 hour DT
 reset (
DC
 only)
4. 12 Hour Drain Cycle
DV
 opens for 
0 minutes every 1
 hours
See "3. 1
 Hour Drain Cycle" below.
3. 12 Hour Drain Cycle
Shutdown & Restart
1
Drain Cycle initiates 
      
2. Ice Purge Cycle 
3. Drain Cycle
4. 12 hour DC - Restart
    See "1. Fill Cycle" above
DV on for 20 minutes