Zhone 7995 Instrução De Instalação
2
Installation Overview
Installation and configuration of the Hotwire 799x endpoint consists of:
Connecting power to the unit.
Connecting to the network.
Connecting to a DTE.
Connecting a system terminal.
Providing initial unit identity information or changing existing identity information.
Configuring your unit using the Configuration Edit menus.
Before you install the unit, read the
See the
for
additional information about:
Configuration Options
Messages and Troubleshooting
Technical Specifications
Connectors, Cables, and Pin Assignments
Connecting Power to the Unit
If your package includes a power transformer:
1. Plug the power cable into an AC outlet having a nominal voltage rating between
100 – 240 VAC.
2. Connect the power cable to the transformer.
3. Connect the output cable of the transformer to the connector marked POWER on
the rear panel.
If your package includes a direct-connection DC power cable:
Connect the unit to an external +24 or –48 VDC SELV (Safety Extra Low Voltage) power
source as described in the following section.
source as described in the following section.