Zhone 7995 Instrução De Instalação

Página de 32
2
Installation Overview
Installation and configuration of the Hotwire 799x endpoint consists of:
„
Connecting power to the unit.
„
Connecting to the network.
„
Connecting to a DTE.
„
Connecting a system terminal.
„
Providing initial unit identity information or changing existing identity information.
„
Configuring your unit using the Configuration Edit menus.
Before you install the unit, read the 
See the 
 fo
additional information about:
„
Configuration Options
„
Messages and Troubleshooting
„
Technical Specifications
„
Connectors, Cables, and Pin Assignments
Connecting Power to the Unit
If your package includes a power transformer:
 
1. Plug the power cable into an AC outlet having a nominal voltage rating between 
100 – 240 VAC.
2. Connect the power cable to the transformer.
3. Connect the output cable of the transformer to the connector marked POWER on 
the rear panel.
If your package includes a direct-connection DC power cable:
 
Connect the unit to an external +24 or –48 VDC SELV (Safety Extra Low Voltage) power 
source as described in the following section.