Netgear M4300-24X24F (XSM4348S) - Stackable Managed Switch with 48x10G including 24x10GBASE-T and 24xSFP+ Layer 3 Manual Do Equipamento

Página de 49
Installation 
44
Managed Stackable Switch Series M4300 
3. 
Connect the end of the power cord to the power receptacle on the second PSU.
4. 
Plug the AC power cord into a power source such as a wall socket or power strip.
When you apply power, the Power 2 LED on the switch front panel lights.
If the Power 2 LED does not light, check that the power cord is plugged in correctly and 
that the power source is good.
Optional Step 9: Connect a Redundant Power Supply
This procedure is optional for model M4300-52G-POE+ only, which can support an optional 
ProSAFE RPS5412 external redundant power supply (RPS). That is, model 
M4300-52G-POE+ can support two internal power supply units (PSUs) and an external RPS.
To install the RPS and apply power:
1. 
Power off the switch.
2. 
Loosen the screws of the RPS cover plate to remove the cover plate and expose the 
RPS interface.
3. 
Connect the RPS cable to the RPS receptacle on the switch.
4. 
Connect to other end of the RPS cable to the RPS.
5. 
Plug the AC power cord of the RPS into a power source such as a wall socket or power 
strip.
6. 
Power on the switch.
Optional Step 10: Connect a Console to the Switch
This procedure is optional. You can manage the switch through its web management 
interface or through a console that is attached to the switch.
To be able to use a console, you need the following items:
A computer with a Windows, MAC, or Linux operating system,
 
a UNIX workstation, or a 
VT100/ANSI terminal.
Depending on the connector type at your computer or terminal, use one of the following 
cables, both of which are included in the product package:
-
Mini USB cable for use with the mini USB console port
-
Ethernet cable for use with the RJ-45 RS232 console port