Netgear M4300-24X24F (XSM4348S) - Stackable Managed Switch with 48x10G including 24x10GBASE-T and 24xSFP+ Layer 3 Manual Do Equipamento
Installation
42
Managed Stackable Switch Series M4300
Figure 20. Installing an SFP transceiver module in the M4300-48X switch
Step 7: Apply AC Power and Check the LEDs
The switch does not provide an on/off switch. The power cord connection controls the power.
Before connecting the power cord, select an AC outlet that is not controlled by a wall switch,
which can turn off power to the switch.
which can turn off power to the switch.
To apply AC power:
1.
Connect the end of the power cord to the power receptacle on the power supply unit
(PSU) on back of the switch.
(PSU) on back of the switch.
2.
Plug the AC power cord into a power source such as a wall socket or power strip.
When you apply power, the Power LED on the switch front panel lights. If your the switch
provides a second power module bay in which no PSU is installed, the Power 1 LED on
the front panel lights.
provides a second power module bay in which no PSU is installed, the Power 1 LED on
the front panel lights.
If the Power LED (or Power 1 LED) does not light, check that the power cord is plugged in
correctly and that the power source is good.
correctly and that the power source is good.
Optional Step 8: Install a Second Power Supply Unit
This procedure is optional. The following full-width models provide a second power module
bay in which you can install an optional second power supply unit (PSU):
bay in which you can install an optional second power supply unit (PSU):
•
M4300-24X24F and M4300-48X