Cisco Cisco Packet Data Gateway (PDG) Guia Da Instalação

Página de 317
Chassis Installation   
▀  Installing the Chassis 
 
 
▄  ASR 5000 Installation Guide 
76 
   
Step 5 
Mount the chassis to the rails of the equipment rack with the hardware that was supplied with the equipment rack. Begin 
with the two bottom holes and work your way up until all holes on each flange are secured. 
 
Step 6 
Repeat step 1 through step 5 for any additional chassis you are installing in the equipment rack. 
Step 7 
Proceed to th
  section and ground the chassis. 
Grounding the Chassis 
Make sure that the chassis is properly grounded prior to installing any chassis sub-components or cards. The chassis and 
the equipment rack or telecommunications cabinet that it is installed in must be connected to the same ground.  
Caution:
  Failure to properly ground the chassis could result in personal injury and/or damage to the chassis and 
its components. 
There are two sets of grounding terminals located at the lower-rear of the chassis. The following figure and the table that 
follows show the location of these terminals and provide specifications for the appropriate lug and cable size.