Cisco Cisco Agent Desktop 8.5 Guia Do Utilizador

Página de 222
Agent Management Work Flows
June 2007
121
b. To specify that an action takes place on a specific date, select Date, and 
then select the desired date from the calendar. Today’s date is circled in 
red. You must specify a time of day as well.
The condition you set up is automatically entered in the first Data Field 
Conditions line in the Current Rule Conditions section of the Work Flow 
window, and the Enable Rule check box is automatically selected.
5. Click Edit next to the 2 remaining Data Field Conditions fields to further define 
the rule, if desired: 
Specify if the agent is on hook or off hook
Specify if the agent state is or is not equal to Ready or Not Ready
Figure 61. 
State Condition dialog box
6. Under the Actions pane, click Add to choose one or more actions to run when 
the event occurs and the rules are met. 
You can select an existing action, or create a new action. See 
 for more information.
7. Click Apply to save the new time of day work flow.