Cisco Cisco Packet Data Gateway (PDG) Guia Da Instalação
Card Installation
▀ Card Slot Assignments
▄ ASR 5500 Installation Guide
64
Card Slot Assignments
The tables below show recommended card slot assignments for typical installation scenarios. The recommended card
assignments are based on the multiple power planes sourcing power to the card slots. Refer to the Power Planes section
of the Power Cabling chapter for additional information.
assignments are based on the multiple power planes sourcing power to the card slots. Refer to the Power Planes section
of the Power Cabling chapter for additional information.
Following the recommendations preserves redundant operation if input power is lost to one or more of the power
circuits on the PFUs.
circuits on the PFUs.
Table 7. ASR 5500 Chassis Card Slot Assignments
Slot
Card Sequence
Requirement
Rear of Chassis
1
DPC-5 or UDPC-5
Available
2
DPC-3 or UDPC-3
Required for all systems
3
DPC-1 or UDPC-1
Required for all systems
4
DPC-7 or UDPC-7
Available
5
MIO-1 or UMIO-1
Required for all systems
6
MIO-2 or UMIO-2
Required for all systems
7
DPC-8 or UDPC-8
Available
8
DPC-2 or UDPC-2
Required for all systems
9
DPC-4 or UDPC-4
Required for all systems
10
DPC-6 or UDPC-6
Available
Front of Chassis
11
SSC-2
Required for all systems
12
SSC-1
Required for all systems
13
FSC-6
Available
14
FSC-4
Required for all systems
15
FSC-2
Required for all systems
16
FSC-3
Required for all systems
17
FSC-1
Required for all systems
18
FSC-5
Available
19
Reserved
20
Reserved