Card Installation   
▀  Card Slot Assignments 
 
 
▄  ASR 5500 Installation Guide 
64 
   
Card Slot Assignments 
The tables below show recommended card slot assignments for typical installation scenarios. The recommended card 
assignments are based on the multiple power planes sourcing power to the card slots. Refer to the Power Planes section 
of the Power Cabling chapter for additional information. 
Following the recommendations preserves redundant operation if input power is lost to one or more of the power 
circuits on the PFUs. 
Table 7.  ASR 5500 Chassis Card Slot Assignments  
Slot
 
Card Sequence
 
Requirement
 
Rear of Chassis
 
1
 
DPC-5 or UDPC-5
 
Available
 
2
 
DPC-3 or UDPC-3
 
Required for all systems
 
3
 
DPC-1 or UDPC-1
 
Required for all systems
 
4
 
DPC-7 or UDPC-7
 
Available
 
5
 
MIO-1 or UMIO-1
 
Required for all systems
 
6
 
MIO-2 or UMIO-2
 
Required for all systems
 
7
 
DPC-8 or UDPC-8
 
Available
 
8
 
DPC-2 or UDPC-2
 
Required for all systems
 
9
 
DPC-4 or UDPC-4
 
Required for all systems
 
10
 
DPC-6 or UDPC-6
 
Available
 
Front of Chassis
 
11
 
SSC-2
 
Required for all systems
 
12
 
SSC-1
 
Required for all systems
 
13
 
FSC-6
 
Available
 
14
 
FSC-4
 
Required for all systems
 
15
 
FSC-2
 
Required for all systems
 
16
 
FSC-3
 
Required for all systems
 
17
 
FSC-1
 
Required for all systems
 
18
 
FSC-5
 
Available
 
19
 
Reserved
 
20
 
Reserved