Cisco Cisco Packet Data Gateway (PDG) Guia Da Instalação

Página de 195
Card Installation   
▀  General Installation Sequence 
 
 
▄  ASR 5500 Installation Guide 
66 
   
General Installation Sequence 
Circuit cards and baffles are installed in the ASR 5500 chassis as follows: 
 
Front circuit cards and baffles are installed from Right to Left. Start at slot 20 and continue to slot 11. Slots 19 
and 20 always require baffles. 
 
Rear circuit cards and baffles are installed from Left to Right. Start at slot 1 and continue to slot 10. 
Complete the installation of each card (includes securing the card in the chassis using a Phillips #2 screwdriver) before 
proceeding to the next card. 
You can install all circuit cards and then install baffles to cover empty chassis slots. It does not matter whether you 
install all front cards or all rear cards first. 
See the diagram below. 
Figure 11.  Installing Circuit Cards and Baffles