Lock Box Installation
Different methods can be used to install the stretch tap in a lock box. Instructions for
a lock box installation may differ slightly depending on the size of the lock box, the
system construction, or even the installation practices employed. The following
diagram shows one possible method, in which the feeder cable enters and exist the
housing on the same side.
a lock box installation may differ slightly depending on the size of the lock box, the
system construction, or even the installation practices employed. The following
diagram shows one possible method, in which the feeder cable enters and exist the
housing on the same side.
Note: The steps described below for installing the stretch tap in a pedestal also
generally apply to lock box installation.
generally apply to lock box installation.
Guidelines
The housing is configured for typical strand mount where the feeder cable enters
one side of the housing and exits the other side. When installing the tap in a
pedestal, the feeder cable enters and exits the housing on the same side. To avoid
signal degradation in this case, it is necessary to completely remove the pass-
through cable.
one side of the housing and exits the other side. When installing the tap in a
pedestal, the feeder cable enters and exits the housing on the same side. To avoid
signal degradation in this case, it is necessary to completely remove the pass-
through cable.
Proceed to To Remove the Pass-Through Cable (on page 19).
To Remove the Pass-Through Cable
WARNING:
Do not perform this procedure when cables are entering any of the ports.
Certain components can deliver an electrical shock.
Do not perform this procedure when cables are entering any of the ports.