Cisco Headend System Release 2.5
Appendix D
Direct ASI Rollback Procedures
140
4004148 Rev C
Turn on the BIG
Verify Power-up Sequence
Turn on the BIG and verify that the BIG goes through a power-up sequence. Various
lights should illuminate. After about a minute, the BIG should settle into a steady
state.
lights should illuminate. After about a minute, the BIG should settle into a steady
state.