Cisco Model GS7000 4-Port Node 1 GHz with 42 54 Split Guia Da Instalação

Página de 15
 
 
 
 
Initial Steps
 
This section describes the steps for opening the node housing. 
 
Opening the Housing 
Open the housing as follows: 
1  Loosen the bolts securing the lid to the base (8 places). 
2  Carefully open the lid to allow access to the inside of the housing. 
3  Inspect gaskets on the cover flange. Make sure the gaskets are clean and free of 
any debris.  Prior to closing the node the environmental (black) gasket should be 
re-lubricated with silicon. 
4  Replace any gaskets showing signs of damage (cracked, twisted, pinched, or 
dry)  with new, silicon-lubricated gaskets. 
 
 
Upgrading the RF Split in the GS7000 Node
 
Note:  This  upgrade  procedure  can  be  used  in  the  field  or  to  reduce  network 
downtime you can use spare or in-stock RF module units to perform these steps 
to  upgrade  out-of-service  units.  Then  replace  in-service  RF  modules  with  the 
upgraded  RF  module  units.  Return  the  replaced  RF  modules  to  stock  so  that 
they can become the next  units for upgrade and swap procedures. 
 
 
 
 
CAUTION: 
To prevent electrostatic discharge (ESD) to electronic equipment, take ESD
precautions, including the use of an ESD wrist or ankle strap or an anti-static
mat.