4. Verify the following:
- The power supplies are operational, indicated by the illumination of the
green light below the power cord connector.
-
The server’s fan and blower are operating.
- The adapter cards (if installed) are properly installed in their slots, and
each initializes (is enabled by the appliance software) without problems.
- There is network connectivity to the server.
. If any of these conditions are not met, refer to
Troubleshooting
.
5. Power down the server and remove all cables prior to installing it in the rack.
Mounting the SV Director Server in a 4-Post Rack
To install the SV Director Server in a 4-post rack, follow these steps:
Warning! When the unit is installed in a rack and is fully extended on its slide
rail, it is possible for the rack to become unstable and tip over, which could cause
serious injury. To eliminate the risk of rack instability from extending the rail or in
the event of an earthquake, you should affix the rack to the floor.
rail, it is possible for the rack to become unstable and tip over, which could cause
serious injury. To eliminate the risk of rack instability from extending the rail or in
the event of an earthquake, you should affix the rack to the floor.
Figure 26 shows the rails and brackets that you need to install the SV Director
Server in a 4-post rack. Figure 27 lists the contents of the 4-Post Rack Mount
Hardware Kit that comes with the SV Director Server.
Server in a 4-post rack. Figure 27 lists the contents of the 4-Post Rack Mount
Hardware Kit that comes with the SV Director Server.
Figure 26. 4-post Rails and Brackets
No.
Description
1
Rear-mounting bracket of outer slide rail
2
Front-mounting bracket of outer slide rail
3
Inner slide rail