Cisco Cisco E-Mail Manager Unity Integration Option Guia Do Utilizador
2-6
ICM WebView Online Help
Working with Reports
Change the date range format in historical reports
Step 5
Save the report definition to save your changes.
Change the date range format in historical reports
The date range you choose for historical reports appears at the top of a report. The
default format is mm/dd/yyyy (month, day, year). You can change this format.
The format for the date range is controlled by your browser's language settings.
The format for the date range is controlled by your browser's language settings.
WebView is currently built to detect French, Chinese, Japanese, and UK English. If
WebView does not detect any of the preceding languages, it will default to
US-English (mm/dd/yyyy) format.
To change the format for the date range
Step 1
Modify your browser's Language settings to select the language that uses the
appropriate date format. For example, if you want the date format to be
dd/mm/yyyy, select a language such as French. For more information on modifying
the language setting, refer to your browser's help.
Step 2
Refresh the report page. The date now appears in the format of the selected
language.
Run drill-down reports
Drill-downs allow you to launch a detailed sub-report from within the current report
window. Once the new report is launched it can be saved as a separate report
definition.
Drill-down reports have the same dates and times defined as the report from which
Drill-down reports have the same dates and times defined as the report from which
they were launched. Although you can save the drill-down report as a separate
report definition, the drill-down assignments remain set in the original report. You
can open additional drill-downs from within the original report.
This section contains:
This section contains:
•
•
Running drill-down reports
To run drill-down reports
Step 1
On an open report window, click the Drill Down menu option. The Choose
Drill-Down page opens.